474 KM 56-inch gas pipeline to transport natural gas from Russia across Europe to Bulgaria. Contract was awarded in November 2019 and successfully completed by October 2021.
Detailed engineering design, procurement and construction of 422KM 56″ underground pipeline starting from pump station 07 near Riyadh to pump station 11 near Madina.
Major scope is to construct the ROW along the pipeline, construction of pipeline, 21 valve station, burn pits, black powder filtration system, corrosion inhibitor skids, eleven (11) thrust bore road crossing.
No. 120 well sites, No.10 field gathering stations, No.6 Gas Distribution Manifolds. 900km of flow lines, trunklines, water treatment units, and utilities.
EPC for gas treatment plant 3 MMSCMD with dehydration and a new gas compression station to deliver the gas to the CEC and CED power plants in Djeno.
EPC for a new gas treatment plant to fractionate the raw gas coming from the Nawara gas field (in the southern Tunisian desert) into methane, propane, butane, and LPG, for final sale.